Thank you for choosing PurchasingEfficiency.com to source Part Number CK-104 LONG LEAD with an NSN 5910-00-113-5499. Purchasing Efficiency is a leading website for purchasing long lead-time, hard to find, and obsolete parts, as well as new and used parts.
Please complete the RFQ form for part number CK-104 LONG LEAD with 71590 and a dedicated product expert will be in touch with you within 15 minutes to discuss your quote for part number CK-104 LONG LEAD, NSN 5910-00-113-5499, and manufactured by Crl Components Inc.
We stock more than 25 million parts from 5,100+ recognized manufacturers. All orders are supplied through California, comprising of a comprehensive product inventory. For any additional queries, you can contact us 24/7 on our toll-free number: +1-714-705-4780 or e-mail us at sales@purchasingefficiency.com
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | WO MTG FACILITIES TERMINALS ON ONE SURFACE |
AARG | RELIABILITY INDICATOR | ESTABLISHED |
AARH | RELIABILITY FAILURE RATE LEVEL IN PERCENT | 0 0010 |
ABJT | TERMINAL LENGTH | 1 250 INCHES MINIMUM |
ADAQ | BODY LENGTH | 0 290 INCHES NOMINAL |
ADAT | BODY WIDTH | 0 290 INCHES NOMINAL |
ADAU | BODY HEIGHT | 0 090 INCHES NOMINAL |
AEBP | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH | 0 200 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0 025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODES |
AGAV | END ITEM IDENTIFICATION | MULTIPLE LAUNCH ROCKET SYSTEM MLRS |
CQBF | INSULATION RESISTANCE AT MAXIMUM OPERATING TEMP | 10000 0 MEGOHMS |
CQBQ | CAPACITANCE VALUE PER SECTION | 0 100 MICROFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -25 0 TO 15 0 WITH RATED VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55 0 DEG CELSIUS MINIMUM AND 125 0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 100 0 DC SINGLE SECTION |
CRTP | TOLERANCE RANGE PER SECTION | -10 00 TO 10 00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 100000 0 MEGOHMS |
CWPM | DISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT | 2 5000 |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
NHCF | NUCLEAR HARDNESS CRITICAL FEATURE | HARDENED |
TEST | TEST DATA DOCUMENT | 81349-MIL-C-39014 SPECIFICATION INCLUDES ENGINEERING TYPE BULLETINS BROCHURESETC THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT EXCLUDES COMMERCIAL CATALOGS INDUSTRY DIRECTORIES AND SIMILAR TRADE PUBLICATIONS REFLECTI |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
ZZZK | SPECIFICATIONSTANDARD DATA | 81349-MIL-C-390142 GOVERNMENT SPECIFICATION |
Quotes within 15 minutes |
|
Competitive Prices |
|
Dedicated and Knowledgeable |
|
AOG Services 24/7 x 365 |
|
Same-day |
If You’d Like to Stay Up to Date On the Newest Parts That We offer, Kindly Go Through Our Aircraft Parts Catalog.
Request for Quote